DEXION RACKING Pallet Racking Solutions Background
Engineered Storage Solutions

Pallet Racking Solutions

The P90 platform engineered by DEXION RACKING delivers high-density, scalable storage infrastructure from manual operations to fully automated high-bay warehouses.

DEXION RACKING P90 Platform

Industrial Racking Engineered for Load Integrity & Growth

Built to international structural standards including EN 15512, FEM, and ISO, the P90 modular system maximizes vertical height, streamlines aisle management, and prepares logistics sites for future automated handling.

30 Tonnes
Maximum Upright Bay Load Capacity
5 Tonnes
Maximum Beam Pair Load Limit
Up to 30m
High-Bay Rack Height Capability
Up to 20%
Density Gain via Layout Re-engineering

Scalable Modular Design

Standardized upright pitches and universal beam connectors allow seamless bay adjustments, height extensions, and picking level re-profiling without system replacement.

  • 50mm vertical slot adjustment
  • Compatible with wire mesh & steel decking
  • Quick boltless beam locking pins

Industrial Load Integrity

Manufactured using certified structural coils with full batch traceability. Engineered with finite element analysis (FEA) to resist dynamic forklift impact and local seismic stresses.

  • Full EN 15512 & SEMA compliance
  • Standard hot-dip galvanized or RAL powder coat
  • Certified laboratory verified stress curves

Automation & AGV Ready

Precision-milled rail alignments and deflection-tested steel profiles accommodate autonomous mobile robots (AMRs), automated shuttles, and narrow-aisle stacker cranes.

  • Tolerances calibrated for robotic picking
  • Compatible with pallet shuttle systems
  • Integrates with automated WCS/WMS networks
Engineered Configurations

Pallet Racking Systems Designed for Operational Throughput

Select the racking architecture aligned with your SKU profiles, pallet rotation protocols (FIFO/LIFO), and fleet equipment.

DEXION RACKING Selective Pallet Racking

Selective Pallet Racking

The industry benchmark for 100% immediate selectivity. Ideal for distribution centers handling high SKU counts, variable pallet footprints, and quick stock turnover.

DEXION RACKING Mobile Pallet Racking System

Mobile Pallet Racking (MOVO)

Racks mounted on motorized rail bases eliminate fixed aisles, cutting required footprint by up to 45% while preserving direct access to every pallet position. Suited for cold storage.

DEXION RACKING Pallet Shuttle System

Pallet Shuttle Systems

Semi-automated deep-lane pallet runners handle high-density lane loading and unloading via remote control, reducing forklift travel distance and vehicle exhaust emissions.

DEXION RACKING Mega Distribution Center Project Case Benchmark
Global Fulfillment Hub

High-Density Retail & eCommerce Distribution Facility

A flagship 110,000 m² distribution hub commissioned with custom-engineered DEXION RACKING P90 systems. The installation combined heavy-duty wide-aisle pallet storage with multi-tier mezzanine picking zones, delivering robust throughput during peak fulfillment cycles.

110,000 m² Facility Floor Plate
145,000 Pallet Positions
16,500 m² Mezzanine Shelving

Delivered via phased handovers with certified installation oversight to ensure uninterrupted facility start-up and complete health & safety compliance.

Structural Component Profiles

Precision Steel Profiles Engineered to Load Criteria

Beam sizing and frame geometries are calculated using structural analysis to guarantee deflection limits well within EN 15512 safety ratios.

Profile Type Standard Profile Heights Primary Application Surface Finish Options
P90 Box Beam 60mm – 160mm Universal pallet racking, heavy euro-pallet and industrial load support Hot-dip galvanized / RAL powder-coated
P90 Open Beam 50mm – 75mm Drop-in timber decks, wire mesh shelves, custom container cradles Corrosion-resistant galvanized
Silverline I-Beam 100mm, 125mm, 140mm Cost-optimized long-span distributed loads and standard storage runs Hot-dip galvanized steel
Heavy IPE / Sigma Profiles Custom calculated Extreme heavy bay loads, integrated crane structures, and clad-rack buildings Industrial anti-corrosive primer & topcoat
Turnkey Project Delivery

From Structural Survey to EN 15635 Inspection

A documented engineering execution methodology mitigating technical risk for overseas procurement teams and main contractors.

Phase 01

Consulting & Site Analysis

Detailed evaluation of pallet dimensions, load weights, floor slab capacities, forklift mast reach, and fire suppression clearances.

Phase 02

Structural CAD & Static Calculations

Complete layout drawings with FEA load-distribution analyses verified against Eurocode and local building seismic mandates.

Phase 03

Automated Manufacturing

Industrialized roll-forming and robotic welding across company-owned production facilities, ensuring uniform dimensional accuracy.

Phase 04

Certified Site Erection

Turnkey assembly supervised by certified engineers, adhering to rigorous zero-harm safety practices and structural alignment tolerances.

Phase 05

Load Testing & Commissioning

Systematic handover documentation including official load capacity signage, bay data placards, and operational maintenance manuals.

Phase 06

Annual EN 15635 Audits

Comprehensive ongoing structural health inspections by accredited inspectors, issuing detailed green/amber/red safety assessments.

Frequently Asked Questions

Pallet Racking Technical & Procurement FAQ

Clear answers from our technical engineering desk on planning, sizing, and lifecycle compliance.

What factors determine the cost of a pallet racking installation?
Pallet racking is engineered on a project-specific basis. Project investment depends on overall pallet position volume, clear warehouse height, floor slab load ratings, bay load profiles (from 500 kg to over 4,000 kg per level), handling machinery aisles, and accessories such as column guards or mesh screens. We provide detailed layout studies and pricing assessments within rapid response schedules.
What is the typical lead time for a complete pallet racking project?
Standard customized installations generally require 8 to 16 weeks from approved structural drawings through manufacturing, site delivery, and completed assembly. Minor bay expansions or standard retrofit configurations can often be fulfilled considerably faster from available profile inventories.
Can our existing warehouse racking be retrofitted without halting operations?
Yes. Most modernization and expansion projects are engineered in localized, phased stages. Our certified installation specialists cordon off specific aisles, re-profile beam heights, or add high-density shuttle runs while your warehouse team maintains standard shipping and receiving in adjacent bays.
How does the P90 system support future warehouse automation?
The DEXION RACKING P90 architecture is designed with precise roll-forming tolerances that accommodate automated pallet shuttles, autonomous mobile robots (AMRs), and stacker cranes. A facility can start with standard forklift selective racking and upgrade to semi-automated deep-lane or automated storage without dismantling the existing upright framework.
What are the mandatory inspection standards for pallet racking systems?
International safety standard EN 15635 dictates that industrial steel storage systems undergo annual formal technical inspections by a qualified, independent inspector. Operators are also expected to carry out routine internal inspections to identify beam deflection, twisted uprights, or damaged base plates before failure occurs.

Engineered Storage Systems Sized for Global Operations

Connect with a DEXION RACKING storage engineer to analyze your warehouse floor plan, structural requirements, and throughput goals.

Send an Inquiry